Preserve Neumarkt Bus Hub and the Calm of Johannisfreiheit! No Additional Burden on Johannisstraße!
At the central bus hub Neumarkt in Osnabrück, passage for 70% of buses is to be blocked.
This is the decision of CDU, Bündnis90/Die Grünen, and SPD in the Osnabrück city council. For the 70 meters blocked in the east-west direction in front of the courthouse, a 1000-meter-long detour through the city center will be built. The detour passes, among other places, through the historic core of Neustadt and the green Johannisfreiheit. Currently, this narrow passage is used only by cyclists and emergency vehicles heading to the hospitals. Opening Johannisfreiheit for permanent bus traffic requires extensive concreting, as already seen on Johannisstraße.
Negative consequences for the city center and its connections include, among others:
- Worse transfer options due to long walks to stops in side streets.
- Longer travel times for up to 800 buses daily due to kilometer-long detours.
- Loss of traffic calm for the health district (Marienhospital, children’s hospital, other facilities) on Johannisfreiheit.
- Hundreds of additional buses in the already heavily burdened pedestrian zone Johannisstraße.
- Higher costs for bus transport.
- Development of the available alternatives to maintain the central bus hub "Neumarkt" with direct access from all directions,
- Priority for safety and functionality at Neumarkt, strengthening the calm on Johannisfreiheit, and upgrading the pedestrian zone Johannisstraße.
- The connection of many districts of Osnabrück, the Osnabrück district, and communities in North Rhine-Westphalia such as Lotte, Westerkappeln, and Mettingen will become more expensive and complicated.
- The planning and construction of the detour via Johannisfreiheit and Johannisstraße are costly and delay the implementation of an efficient bus network for years.
- As a result, the entire Osnabrück city center continues to lose its appeal. The devaluation of the pedestrian zone Johannisstraße continues. The downward spiral in retail intensifies.
- Due to bus traffic at minute intervals and the parallel two-way bike path, it becomes more dangerous to cross Johannisfreiheit on foot. Affected are patients, visitors, and employees of the health district (Marienhospital, Christliches Kinderhospital, etc.) and pedestrians to/from the main train station.
- Johannisfreiheit, which is significant for the founding history of Osnabrück, with the historic ensemble of Johannis Church and Neustadt Town Hall, loses its calm and experiential quality. The currently single-lane and green traffic-calmed area between the hospitals will be replaced by a 14-meter-wide concrete track. For the realization of the bus track, the church congregation must sell part of the graveyard of its former cemetery to the city of Osnabrück.
- The historic building fabric on Johannisfreiheit, which was already damaged by construction work in the past and is under observation, will be exposed to further stress. The effects of the operation of very heavy electric buses in the tight curve are unpredictable.
- The situation for cyclists and pedestrians in Neustadt worsens: They will constantly be in conflict with the dense bus traffic on Johannisstraße. The heavily used southern Wallring, which is already too narrow for safe cycling measures, must also accommodate buses.
Despite the city of Osnabrück’s extreme debt, a total of 27 million euros is to be spent on redesigning Neumarkt as the "New Center". Many other costs are still unclear; so far, there are no cost plans for the detours via Johannisfreiheit, Pottgraben, Petersburger Wall. The additional operating costs for the detours are estimated to be six figures per year. It is also unclear whether the requested subsidies in the millions will be approved. In any case, less money will be available for urgent investments, e.g., in schools.